PHASE 03STAGE-BASED ROADMAP
Research

Build the evidence, then build the machine.

The roadmap advances through technical evidence and acceptance gates rather than public calendar promises.

PUBLIC STATUS BOUNDARY

Sequence is directional and changes with engineering evidence

CODE-NATIVE SYSTEM VIEW
EDITABLE / RESPONSIVE
  1. 01
    activeWorkload contracts and RISC-V reference platforms
  2. 02
    activeProtonSim and architecture performance modeling
  3. 03
    plannedProton SDK, runtime, and llama.cpp backend
  4. 04
    plannedProton LPU-E0 RTL and verification
  5. 05
    futureFPGA reference system
  6. 06
    futureOpen ASIC exploration
  7. 07
    futureProton LPU-E1 multi-tile edge architecture
  8. 08
    long-termProton LPU-S1 server research
01ADVANCEMENT GATES

A stage advances when its outputs support the next decision.

Workload contracts, validated models, software artifacts, RTL verification, implementation results, and review decisions form the gates between stages.

02CURRENT EMPHASIS

Workload contracts, simulation, and reference enablement come first.

The active direction is to reduce architecture uncertainty before treating RTL, FPGA, ASIC, or multi-tile work as complete commitments.

03FUTURE SYSTEMS

E1 and S1 remain roadmap families, not announced products.

Proton LPU-E1 represents a future scalable edge direction. Proton LPU-S1 represents longer-term server-class research.

04CHANGE POLICY

Evidence may reorder, split, or retire a stage.

A stage-based roadmap preserves technical honesty while the architecture, software, and evidence mature.

CONTINUE THE SYSTEM

Return to the Proton platform

Continue